It's August 2 & the drywall team is here!! Within 2 days, 60% of the house has drywall!
The drywall got delivered 2 weeks prior & a hole had to be cut in the exterior wall to bring the drywall in.
There is also a hole cut in the ceiling to bring the drywall to the attic floor...
We get a much better sense of the size of the space with the drywall installed...